London Underground
- Registered approved contractor
- L.U.L. trained personnel
- Major contracts undertaken
- Competitive pricing structure
- Safety policy conforming to L.U.L. procedures
Strada have, over the last 10 years, been actively involved in carrying out preparation and coatings to virtually every structure on the Jubilee Line, Northern Line and District Line and sub-surface structures from Embankment to Monument.
We have carried out the works, either as a direct contractor for L.U.L., or to various main contractors. London Underground's strict safety guidelines and requirements mean that all our personnel, both administrative and field staff, are required to carry out regular training updates to keep abreast of the latest L.U.L. procedures, working practices and standards.

Click to enlarge
Epping Station Footbridge
Epping Station Footbridge was completed under the framework agreement for Enterprise Plc. The footbridge was overhauled with a new deck and redecoration, whilst other platform works were being carried out.
Epping Station Footbridge Case Study

Click to enlarge
HC17 Shepherds Bush
HC17 is an over bridge spanning across wood lane on the A219 between Latimer road station and Shepherds Bush station. The specification called for a Clean down, followed by Mechanical and hand preparation to the breakdown areas and sound areas, and finally a full undercoat and finish coat to RT98 M24.
HC17 Shepherds Bush Case Study

Click to enlarge
Kilburn Bridge
The bridge carries the track over Kilburn High Road in London. The specification was for a total blast clean to remove all the existing lead-based paint followed by a full paint system.
All trackside blasting and painting was carried out during possessions. The main steelwork over the road was completed during daytime hours from fixed-sheet scaffold with no disruption to the general public.

Click to enlarge
Northumberland Park Depot
Work was carried out to the internal steel trusses and buffers which were mechanically cleaned and painted to L.U.L. specifications.
The works were carried out during daytime hours whilst the depot was operational.